Évaluation Trustpilot étoiles 4,7/5 Excellent

Magnetic Mini GPS Tracker with Real-Time Location, Motion Alerts and Audio Monitoring

$58.99 Regular price $92.99 Save 37%
/
Post Free shipping & Free returns
  • Lowest price guarantee
  • Ordered before 11 pm, shipped today

Delivery & Collection
Collect in store
Out of stock
Online: in stock
Free delivery

American Express Apple Pay Google Pay G Pay Maestro Mastercard PayPal Visa

Never lose what matters most

A stolen car. Lost luggage. A missing pet. That sinking feeling when you realize something valuable is gone.
This tracker gives you back control. With real-time GPS tracking on your smartphone, you always know instantly exactly where your belongings are.

Why this tracker protects you:

Real-time GPS tracking Real-time location updates sent straight to your phone. See where your vehicle, luggage or valuables are anytime, anywhere.

Instant motion alerts Get a notification the moment a tracked item starts to move. Ideal for preventing theft or keeping an eye on what matters to you while you're away.

Audio monitoring feature Listen in remotely using the built-in audio feature. Extra security when you need to know what's going on.

Strong magnetic mount Attaches securely to any metal surface in seconds. No drilling, no installation, no hassle.

Long-lasting battery A reliable 3V lithium coin cell keeps the tracker running when you need it most. Set it and forget it.

Weatherproof Works in extreme temperatures from -20 °C to +70 °C. Rain, snow or heat – it stays on track.

Perfect for protecting:

  • Vehicles Helps prevent car theft with instant alerts.
  • Luggage and bags Never lose your belongings when traveling again.
  • Valuable equipment Protect your expensive tools and gear.
  • Bikes and motorcycles Find your vehicle again if it ever disappears.
  • Elderly family members Enjoy peace of mind knowing your loved ones are safe.
  • Pets Always know where your four-legged companion is.

What's included:

Every tracker includes:

  • Magnetic GPS tracker with live location features
  • Full control via smartphone app (iOS and Android)
  • Real-time motion alerts
  • Audio monitoring feature
  • Easy setup in minutes

Specifications:

  • Material: Sturdy ABS plastic
  • Dimensions: 4.12 cm × 1.36 cm (ultra-compact)
  • Frequency: 850/900/1800/1900 MHz
  • Operating temperature: -20 °C to +70 °C
  • Power supply: 3V lithium coin cell
5 stars
Verified

Actually looks like the photos

Colour and fit matched what I expected from the website. The material feels better than expected and delivery was quick.

Robert H.
Robert H.
5 stars
Verified

Next day, no bother

Ordered in the afternoon and it arrived the following day. Fits brilliantly and the process was straightforward.

Lucy P.
Lucy P.
4 stars
Verified

Still feels current

The styling feels clean and modern. Classic pieces without trying too hard to follow trends.

D
Daniel W.
5 stars
Verified

Sizing is spot on

Followed the size guide and my usual size fit perfectly. Nicely balanced without being too loose.

Katherine B.
Katherine B.
5 stars
Verified

Proper quality

The fabric has a substantial feel and the finishing is very neat. It feels genuinely well made.

William T.
William T.
4 stars
Verified

Looks exactly like the photos

The colour and cut were accurate to the website and it arrived nicely packaged.

A
Alice R.
5 stars
Verified

Sorted without any fuss

I ordered the wrong size and contacted support. They replied quickly and sorted everything.

M
Mark S.
5 stars
Verified

A real person behind it

The attention to detail comes through in the packaging, service and consistency.

Patricia G.
Patricia G.
4 stars
Verified

Held up after washing

Several washes later and it has kept its shape and colour. Still looks great.

S
Sam F.
5 stars
Verified

Worth every penny

The quality feels very fair for the price and the product feels built to last.

N
Natalie C.
5 stars
Verified

My husband ordered one too

I ordered first and after seeing mine my husband went straight to the site for his own.

Jenny A.
Jenny A.
4 stars
Verified

Returns were simple

One item wasn't quite right. Support responded quickly and handled the return without hassle.

T
Thomas L.
5 stars
Verified

No issues at all

Delivery was quick and straightforward. The quality is excellent and sizing accurate.

A
Andrew M.
4 stars
Verified

Third order this month

Third order already. That probably says enough.

C
Claire D.

Customer Service

We Are Here For You

Do you have questions about an order, delivery, or product? Feel free to contact us. You can always call or email us.

Available:
Monday to Saturday
9 AM – 8 PM
Free delivery
FREE DELIVERY

Fast and free shipping on all your orders.

30-day returns
30-DAY RETURNS

Not satisfied? Return your order within 30 days hassle-free.

Secure payments
SECURE PAYMENTS

Shop with confidence knowing your payment information is safe.

Customer support
CUSTOMER SUPPORT

Have a question? Reach out to our customer support team.